Skip to main content

Case studies

Case Studies

  • Energy industry

    Two Synchronized Verlinde Hoists for Precision Lifting

    CIC ORIO Vefour has integrated a second Verlinde Eurobloc VT3 wire rope hoist onto an existing overhead crane. The installation aimed to facilitate the synchronised lifting of long and fragile tubular parts using dual hooks, in compliance with standard EN 15011, which mandates simultaneous stopping at the end of travel and load summation.